Monday 25th February

Advanced  Warning:

Canterbury, St. Stephens Road Level crossing: Closed 26th Feb (00:15-04:30), 3rd March (06:00-20:00) and 5th March (00:15-04:30) to allow for @networkrail level crossing maintenance and other associated works: http://moorl.uk/?1qdy7lf

Swanscombe, Ebbsfleet Gateway: Overnight closures from 26th February for 4 nights (20:00-05:00) for #PotholeBlitz works: http://moorl.uk/?1tkif5y #Kentpotholes

Sturry, A28 Mill Road: Closed at Sturry Level Crossing 2nd March at 23:50 until 4th March at 04:15 to allow for @networkrail to carry out level crossing maintenance and other associated works. See attached for full details: http://moorl.uk/?1pckdbh

Hawkhurst, A229 Cranbrook Road: Temporary traffic lights from 4th to 15th March near Heartenoak Road for SGN gas mains connection works: http://moorl.uk/?1a1e0qs

Tunbridge Wells, Garden Road: Temporary traffic signals in place 18th - 22nd March to allow for @sewateruk works near the junction with Lansdown Road. Lights will be manually controlled during peak periods to help minimise disruption: http://moorl.uk/?14sqep8

Ongoing:

Ashford: http://www.kent.gov.uk/travel/?E=600500&N=142500

Willesborough / Mersham, A20 Hythe Road: 30MPH speed limit in place from 3rd April in conjunction with construction works for the forthcoming Junction 10A: http://moorl.uk/?fq8ult

Ashford, A2070 Both directions: 24 hour lane closures until June 2019 between The Boulevard and M20 Junction 10. These are in place for the Highway England M20 Junction 10a construction scheme: http://moorl.uk/?m56szz

Ashford, M20 J9-J11 (Both directions): 24 hour lane closure & 50mph speed restriction in place until January 2020 for Highways England Junction 10a construction works: http://moorl.uk/?h941rq

Tenterden, A28 Ashford Road: Temporary traffic lights from 11th February to 19th July between A262 Biddenden Road and Pope House Lane for South East Water new water mains installation works: http://moorl.uk/?13pouq1

 

Canterbury: http://www.kent.gov.uk/travel/?E=614741&N=157742

Herne Bay, The Broadway: Various road closures on side road junctions & traffic restrictions from 7th January for 14 weeks for SGN gas mains replacement works: http://moorl.uk/?ejk2jv

Barham, A260 Old Dover Road: Temporary traffic lights and 40mph speed restriction in place from 7th January for new roundabout construction works: http://moorl.uk/?68wz6v

Herne Bay, A299 Thanet Way (Coast bound): Overnight closures from 23rd February for 23 nights (20:00-06:00) between Eddington Interchange & St Nicholas At Wade for carriageway resurfacing works: http://moorl.uk/?1psoiy3

Whitstable, B2205 Sea Street: Road closure and various traffic restrictions from 25th February for 5 weeks for SGN new gas supply works: http://moorl.uk/?1puio8i

 

Dartford: http://www.kent.gov.uk/travel/?E=554151&N=174250

Greenhithe, @StClementsWay improvement scheme starts 15th January, with off-peak lane closures for vegetation clearance. Visit https://goo.gl/4Nt4XR for more info: http://moorl.uk/?7xrt75

Darenth, A2 (Eastbound): 24hr weight restriction, 50mph speed limit & narrow lanes in place until March 2019 for Highways England M25 Junction 2 Roundabout improvement works: http://moorl.uk/?dca2aw

 

Dover: http://www.kent.gov.uk/travel/?E=631615&N=141894

Deal, A258 Queen Street/Beach Street: Overnight road closures from 22nd February for 8 nights (20:00-05:00) for resurfacing works: http://moorl.uk/?1i4jovx

Whitfield, A256 Whitfield Hill: Lane closures from 25th February for 10 nights (20:00-06:00) for road stud replacement works: http://moorl.uk/?1xmxrzm

 

Folkestone and Hythe: http://www.kent.gov.uk/travel/?E=621848&N=136121

Woolpack Bridge, Brookland (From Rye Rd to Hook Wall): Long-term road closure near the A259 junction due to a dangerous bridge in need of extensive repairs or replacement: http://moorl.uk/?qlts0b

 

Gravesham: http://www.kent.gov.uk/travel/?E=565500&N=174500

There are no reported strategically important roadworks planned.

 

Maidstone: http://www.kent.gov.uk/travel/?E=576500&N=155 500

Maidstone, Week Street and Gabriel's Hill: Works have started on the Week Street and Gabriel's Hill regeneration project. For more information see  http://www.maidstone.gov.uk/home/primary-services/business-and-investment/primary-areas/regeneration/tier-3-primary-areas/week-street-and-gabriels-hill - http://moorl.uk/?4t1p3z

Maidstone, Upper Stone Street: Temporary traffic lights at the Brunswick Street junction. Expect delays on the approaches: http://moorl.uk/?mxiwo4

Headcorn, A274 Mill Bank: Temporary traffic lights on 25th February for 1 day for UK Power Networks electrical pole replacement works: http://moorl.uk/?1hskd8b

 

Sevenoaks: http://www.kent.gov.uk/travel/?E=552924&N=154871

Edenbridge, B2026 Main Road: Temporary traffic lights have been removed until further notice at the Four Elms Road junction improvement works, will advise when these are re-instated: http://moorl.uk/?hpm26y

Leigh, Coppings Road: Road closure from 25th February for 6 days (08:00-17:00) between Compasses Road and Scabharbour Road for carriageway patching works: http://moorl.uk/?1wnzeir

Westerham, Westerham Road: Overnight road closures from 25th February for 5 nights (21:00-07:00) between Clackett Lane and Goodley Stock Road for carriageway patching works: http://moorl.uk/?1t0cbv6

 

Swale: http://www.kent.gov.uk/travel/?E=589363&N=163362

Minster-on-Sea, A2500 Lower Road: Improvement scheme starting on 25th June until December 2019 at the Barton Hill Road junction: http://moorl.uk/?suvpy3 Further information available at http://www.kent.gov.uk/roads-and-travel/what-we-look-after/roads/road-projects/planned-road-projects/a2500-lower-road,-minster

Newington, A2 High Street: Temporary traffic lights from 18th to 27th February near Playstool Road for drainage works: http://moorl.uk/?1umtx2g

 

Thanet: http://www.kent.gov.uk/travel/?E=635297&N=165600

Minster, B2190 Spitfire Way: Overnight road closures from 25th February for 6 nights (20:00-06:00) between Columbus Avenue and B2050 Manston Road for resurfacing works: http://moorl.uk/?11q3afi

 

Tonbridge & Malling: http://www.kent.gov.uk/travel/?E=559500&N=146500

Larkfield, A20 London Road: Temporary traffic lights from 7th January for 8 weeks at the New Road junction for traffic signals upgrade works: http://moorl.uk/?gcu62p

M2 J1-J3 Both directions: Various road, lane and slip road closures from 7th January to 12th March for Highways England M2 bridge joints replacement works: http://moorl.uk/?bo47aw

Aylesford, Hall Road: Temporary traffic lights in place until 1st March for SGN gas mains replacement works: http://moorl.uk/?1g8krs8

Walderslade, Taddington Roundabout, North Section (M2 J3): Overnight road closures from 25th February for 4 nights (20:00-06:00) for resurfacing works: http://moorl.uk/?1f5bude

Ryarsh, Woodgate Road: Road closure from 25th February for 5 days (07:00-19:00) for carriageway repairs and maintenance works: http://moorl.uk/?1n1kqv6

 

Tunbridge Wells: http://www.kent.gov.uk/travel/?E=558500&N=139500

Tunbridge Wells, Monson Road: Various closures / suspension of one way in place from 28th January, see the link for more information https://twitter.com/KentHighways/status/1086265987974995968

Weather

Today:  Chilly with the odd patch mist and fog possible at first, though these will soon clear to leave a dry and sunny day with largely cloudless skies. Feeling very mild for the time of year in light winds Maximum Temperature 18 °C.

Tonight:  Skies staying largely clear this evening and overnight with one or two isolated mist or fog patches possible, though staying clear for most, with a grass frost likely by dawn. Minimum Temperature 1 °C.